units · 31 entries · 4.5–300 MW
Engineering-Led Equipment Sourcing
Used steam turbine
and generator candidates.
Review source-listed models across 4.5–300 MW turbine classes and 4.5–60 MW generator classes. QIZHOU POWER supports requirement definition, technical screening, inspection planning and procurement coordination with the relevant independent supply party.
Reference schedule
Steam turbine and
generator listings.
The combined schedule contains 31 turbine entries and 21 generator entries. It retains exact model strings, separate quantities, condenser models, source-listed production times and the requested manufacturer names for six turbine entries.
Turbines and generators appearing in the same row should be treated as separate candidates until their documents, nameplates and interfaces have been reviewed for the project duty.
units · 21 entries · includes one unit without a rotor
Equipment schedule
Used turbine-generator reference list
On smaller screens, each row is shown as a complete equipment record.
| No. | Equipment | Steam Turbine Model | Condenser Model | Turbine Qty. | Generator Model | Generator Qty. | Source-listed Production Time | Manufacturer | Notes |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 300 MW Steam Turbine | 300 MW Steam TurbineN300—16.7/538/538 | — | 2 | — | — | 2006.1 | Shanghai Electric Group Co., Ltd. | — |
| 2 | 300 MW Steam Turbine | 300 MW Steam TurbineC300-16.67/0.43/537/537 | — | 2 | — | — | 2007.2 | Shanghai Turbine Co., Ltd. | — |
| 3 | 80 MW Steam Turbine | 80 MW Steam TurbineN80-13.24/535/535High-temperature, super-high-pressure, single-reheat condensing steam turbine | — | 1 | — | — | 2016.9 | Dongfang Turbine Co., Ltd. | — |
| 4 | 55 MW Steam Turbine | 55 MW Steam TurbineN55-13.24/535/535High-temperature, super-high-pressure, single-reheat condensing steam turbine | — | 1 | — | — | — | Dongfang Turbine Co., Ltd. | — |
| 5 | 50 MW Steam Turbine | 50 MW Steam TurbineN50-8.83 | — | 2 | — | — | 2004.4 / 2004.8 | Wuhan Turbine Generator Works | — |
| 6 | 25 MW Steam Turbine | 25 MW Steam TurbineB25-8.83/1.27 | — | 1 | — | — | — | Wuhan Turbine Generator Works | — |
| 7 | 25 MW-class Steam Turbine | 25 MW-class Steam TurbineN25-8.83/535 | N-2200 | 2 | 30 MW-class GeneratorQF2W-30-2 | 2 | 2012 | — | — |
| 8 | 12 MW-class Steam Turbine | 12 MW-class Steam TurbineC12-3.43/.98 | — | 1 | — | — | — | — | — |
| 9 | 15 MW-class Steam Turbine | 15 MW-class Steam TurbineB15-4.9 | — | 1 | — | — | — | — | — |
| 10 | 15 MW-class Steam Turbine | 15 MW-class Steam TurbineN15-3.43 | N-1250 | 1 | 15 MW-class GeneratorQF2W-15-2Z | 1 | — | — | — |
| 11 | 40 MW-class Steam Turbine | 40 MW-class Steam TurbineN40-8.83 | — | 1 | 40 MW-class GeneratorQF2W-40-2Z | 1 | 2014 | — | — |
| 12 | 25 MW-class Steam Turbine | 25 MW-class Steam TurbineC25-8.83/.98 | N-2000-10 | 1 | — | — | 2009 | — | — |
| 13 | 6 MW-class Steam Turbine | 6 MW-class Steam TurbineB6-4.9 | — | 1 | — | — | 2007 | — | — |
| 14 | 8 MW-class Steam Turbine | 8 MW-class Steam TurbineN8-3.43 | N-800-11 | 1 | 8 MW-class GeneratorQFW-8-2 | 1 | 2011 | — | Mechanical, electrical and auxiliary equipment are referenced; the item-specific scope is defined during technical review. |
| 15 | 25 MW-class Steam Turbine | 25 MW-class Steam TurbineN25-8.83 | — | 1 | — | — | — | — | — |
| 16 | 25 MW-class Steam Turbine | 25 MW-class Steam TurbineC25-3.43 | — | 1 | — | — | — | — | — |
| 17 | 22 MW-class Steam Turbine | 22 MW-class Steam TurbineC22-4.9 | N-2000 | 1 | — | — | — | — | — |
| 18 | 12 MW-class Steam Turbine | 12 MW-class Steam TurbineB12-4.9 | — | 1 | — | — | — | — | — |
| 19 | 12 MW-class Steam Turbine | 12 MW-class Steam TurbineB12-4.9 | — | 1 | — | — | — | — | — |
| 20 | 20 MW-class Steam Turbine | 20 MW-class Steam TurbineN20-8.83 | N-2000 | 1 | 20 MW-class GeneratorQF2W-20-2C | 1 | — | — | — |
| 21 | 28 MW-class Steam Turbine | 28 MW-class Steam TurbineBN28-8.83 | N-2400-1 | 1 | 30 MW-class GeneratorQFW-30-2 | 1 | — | — | — |
| 22 | 25 MW-class Generator | — | — | — | 25 MW-class GeneratorQFW-25-2A | 1 | — | — | Rotor absent — the source listing states that this generator has no rotor. |
| 23 | 18 MW-class Generator | — | — | — | 18 MW-class GeneratorQFW-18-2 | 1 | — | — | — |
| 24 | 15 MW-class Generator | — | — | — | 15 MW-class GeneratorQF-15-2 | 1 | — | — | — |
| 25 | 6 MW-class Steam Turbine | 6 MW-class Steam TurbineN6-3.43 | N-560 | 1 | — | — | — | — | — |
| 26 | 6 MW-class Generator | — | — | — | 6 MW-class GeneratorQF1-6-2Z | 1 | — | — | — |
| 27 | 4.5 MW-class Generator | — | — | — | 4.5 MW-class GeneratorQF-J4.5-2 | 1 | — | — | — |
| 28 | 12 MW-class Generator | — | — | — | 12 MW-class GeneratorQF2W-12-2Z | 1 | 2014 | — | — |
| 29 | 50 MW-class Steam Turbine | 50 MW-class Steam TurbineC50-8.83 | N-4000 | 1 | — | — | — | — | — |
| 30 | 7 MW-class Steam Turbine | 7 MW-class Steam TurbineB7-4.9 | — | 1 | 7 MW-class GeneratorQF-7-2 | 1 | — | — | — |
| 31 | 4.5 MW-class Steam Turbine | 4.5 MW-class Steam TurbineB4.5-8.83 | — | 1 | 6 MW-class GeneratorQF-6-2 | 1 | — | — | — |
| 32 | 50 MW-class Steam Turbine | 50 MW-class Steam TurbineCCZK50-8.83 | — | 2 | 60 MW-class GeneratorQFW-60-2 | 2 | — | — | — |
| 33 | 6 MW-class Steam Turbine | 6 MW-class Steam TurbineS6-0.98 | N-860 | 1 | 6 MW-class GeneratorQF-K6-2 | 1 | 2012 | — | — |
| 34 | 15 MW-class Steam Turbine | 15 MW-class Steam TurbineN15-3.43 | N-1450 | 1 | 15 MW-class GeneratorQF-K15-2 | 1 | 2012 | — | — |
| 35 | 6 MW-class Steam Turbine | 6 MW-class Steam TurbineN6-2.35 | N-650 | 1 | 6 MW-class GeneratorQFK2-6-2 | 1 | — | — | — |
| 36 | 20 MW-class Generator | — | — | — | 20 MW-class GeneratorQF2N-20-2 | 1 | 2021 | — | — |
| 37 | 12 MW-class Steam Turbine | 12 MW-class Steam TurbineC12-4.9/0.981 | — | 2 | 15 MW-class GeneratorQF-15-2 | 2 | 2005 | — | — |
| 38 | 6 MW-class Steam Turbine | 6 MW-class Steam TurbineB6-4.9/0.981 | — | 1 | 6 MW-class GeneratorQF2-J6-2 | 1 | 2008 | — | — |
Engineering and procurement support
Engineering support beyond the equipment list.
A used turbine-generator decision must fit the steam cycle, electrical system and site—not just the output rating. QIZHOU POWER can coordinate the path from the initial duty to an item-specific technical and commercial proposal.
Read the equipment sourcing FAQ →Requirement definition
Translate the project duty, steam conditions, electrical standard, plant interfaces and package boundary into a focused sourcing brief.
Candidate screening
Compare relevant models, configurations, documents, package contents and site-fit questions before inspection resources are committed.
Inspection planning
Coordinate the document list, nameplate checks, physical inspection scope and technical questions for the shortlisted item.
Procurement coordination
Align the technical scope with inspection terms, contracting, dismantling, packing, inland transport, export delivery and handover requirements.
Working process
From operating requirement to an item-specific proposal.
- 01
Define the duty
Confirm the required power output, steam cycle, electrical standard, operating mode and fixed plant interfaces.
- 02
Screen the list
Identify models close enough to the requirement for a deeper technical and commercial review.
- 03
Inspect and clarify
Agree the document review, physical inspection and package-completeness checks for the shortlisted item.
- 04
Confirm the transaction scope
Define the selling entity, included equipment, services, delivery basis, schedule and commercial terms in the proposal or contract.
Initial matching inputs
Information that helps us screen a used turbine-generator set.
- 01Required output and operating duty
- 02Turbine type: condensing, extraction, back-pressure or another configuration
- 03Main steam pressure and temperature
- 04Extraction or exhaust pressure and required heat load
- 05Rated speed, grid frequency, generator voltage and power factor
- 06Expected operating mode and load range
- 07Existing foundation, layout and plant-interface constraints
- 08Required package scope: turbine, generator, condenser, auxiliaries, controls and electrical equipment
- 09Project country, delivery location and target schedule
- 10Preferred inspection arrangement and required document language
Start with the operating duty
Tell us the duty before choosing the model.
Send the required output, steam conditions, generator standard, plant location, preferred package scope and target schedule. QIZHOU POWER will review the requirement and coordinate a focused equipment discussion with the relevant supply party.